What a week to start a project like this. Within 60 minutes of starting to work on this at 6:30 a.m., I am soaked with sweat just as if I had just come out of a swimming pool. I move slowly and the breeze helps but it doesn't take long before I am completely dehydrated and in need of a fresh set of clothes. I have gotten the cracks all sealed to prevent concrete from oozing out the bottom of the forms and now need to pound in a lot more stakes and do bracing on the back side especially. Concrete is very heavy and exerts a lot of force. I am also going to see about getting a load of sand delivered while the ground is dry to help level out the interior of the form so not as much concrete is needed. The rest of the week is supposed to be just as hot so work sessions will be early in the morning and short in duration. Then we have a few days off for one last vacation before school starts and then the following week is supposed to be 15 degrees cooler on average so I hope to finish up everything and get in touch with my concrete guy. Maybe by September, I will be able to start framing.


0 Yorumlar